Sabine Liquefaction Project Trains 1 – 4

Project Mapping

Site Plan and Creole Trail Pipeline Expansion - site plan of the Sabine Pass LNG Terminal with overlay of liquefaction expansion of the facility (Trains 5 - 6)
Download PDF >

Overall Project Location Map - aerial view of the Sabine Pass LNG Terminal with overlay of liquefaction expansion to the facility (Trains 1 - 4)
Download Map >


FERC Documents

September 1, 2016 - Approval to Construct Phase 2 Flare Modifications 

July 15, 2016 - Approval to Construct Phase 1 Flare Modifications 

June 1, 2016 - Notification of In Service

May 3, 2016 Authorization to commence service of Train 1 and associated facilities

April 18, 2016 Authorization to introduce feed gas and refrigerants in the identified areas for commissioning of Train 2

March 8, 2016 Authorization to deliver, store, and circulate Therminol for commissioning of the Train 2 Hot Oil Utility System 

March 3, 2016 Authorization to introduce fuel gas in Train 2 

February 24, 2016 Authorization to continue the commissioning of Liquefaction Train 1 

February 11, 2016 - Authorization to introduce process fluids into the Stage 1 Condensate Storage and Truck Loading System and to proceed with condensate trucking activities 

December 21, 2015 Authorization to Introduce Fuel Gas and Operate Marine Flare 00Z-1903 

November 19, 2015 Authorization to introduce feed gas and refrigerants 

November 17, 2015 Authorization to introduce fuel gas into Gas Turbine Generators 

October 20, 2015 Authorization to deliver and store propane and ethylene refrigerants in the Train 1 Propane Storage Drums 

October 9, 2015 Authorization to circulate Therminol throughout the Train 1 Hot Oil distribution piping 

October 5, 2015 Authorization to deliver and store Therminol 55 in the Train 1 Hot Oil Surge Drum 

September 23, 2015 Authorization to Introduce Fuel Gas to Train 1 and Stage 1 Outside Battery Limits

February 24, 2016 - Authorization of Train 1 Commissioning Cargo

August 2, 2013 - FERC Order granted for Modification Project under CP13-2.

April 24, 2013 - Environmental Assessment for Sabine Pass LNG, LLC's et al Sabine Pass Liquefaction Project Modification under CP13-2.

October 9, 2012 - Application for Amendment to Section 3 Authorization.

April 16, 2012 - FERC Order Granting Authorization for Sabine Pass Liquefaction Project (Trains 1 - 4). 

December 28, 2011 - Environmental Assessment for the Sabine Pass Liquefaction Project under CP11-72. 

January 31, 2011 - Submittal to FERC of the Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P. application for authorization to site, construct and operate liquefaction and export facilities at the existing Sabine Pass LNG, L.P. liquefied natural gas (“LNG”) terminal located in Cameron Parish, Louisiana (Trains 1 - 4). 

January 31, 2011 - Submittal to FERC of Resource Reports 1 through 13 for Sabine Pass Liquefaction Project (Trains 1 - 4). 

November 19, 2010 - Submittal to FERC of Initial Draft of Resource Reports 1 and 12 (Trains 1 - 4). 

November 15, 2010 - Submittal to FERC of Initial Draft of Resource Reports 2 thru 9 (Trains 1 4). 

November 10, 2010 - Submittal to FERC of Second Draft (Rev.01) Resource Report — Sabine Pass Liquefaction (Trains 1 -4) General Project Description Docket No. PF10-24-000 . 

September 3, 2010 - Submittal to FERC of Initial Draft of Resource Reports 1 and 10 Sabine Pass Liquefaction (Trains 1 -4).

August 4, 2010 - Sabine Pass Liquefaction Project (Trains 1 - 4) pre-filing approval response from the Federal Energy Regulatory Commission - assigned Docket No. PF10-24-000. 

July 26, 2010 - Letter to request to initiate Commission NEPA Pre-filing Process for Sabine Pass Liquefaction Project (Trains 1 - 4).



DOE Documents

May 26, 2016 - Order Granting Blanket Authorization to Export Previously Imported Liquefied Natural Gas By Vessel; Order 3825

March 11, 2016 - Final Opinion and Order Granting Long-Term Multi-Contract Authorization to Export Liquefied Natural Gas by Vessel from the Sabine Pass LNG Terminal located in Cameron Parish, LA, to Non-Free Trade Agreement Nations; Order No. 3792

January 13, 2016 - Order Granting Blanket Authorization to Export LNG by Vessel from the Sabine Pass LNG Terminal located in Cameron Parish, LA; Order No. 3767

February 12, 2015 - Order Granting Long-Term Multi-Contract Authorization to Export LNG by Vessel from the Sabine Pass LNG Terminal in Cameron Parish, LA, to Free Trade Agreement Nations; Order No. 3595

January 8, 2015 - Order Granting Blanket Authorization to Import and Export Natural Gas from and to Canada and Mexico, to Import LNG from Various International Sources by Vessel, and to Export LNG to Canada and Mexico by Vessel and Truck; Order No. 3578

March 7, 2013 - Application of Sabine Pass Liquefaction For Long-Term Authorization to Export Liquefied Natural Gas

May 20, 2011- Opinion and Order No. 2961 Conditionally Granting Long-Term Authorization to Export Liquefied Natural Gas From Sabine Pass Terminal to Non-Free Trade Agreement Nations (Ref: Docket No. 10-111-LNG)

September 7, 2010 - Department of Energy application of Sabine Pass Liquefaction, LLC to request long-term authorization to export LNG to Non Free Trade Agreement Countries (Ref: Docket No. 10-111-LNG)

View the Department of Energy Application EXHIBITS A - F here. 

September 7, 2010 - Order No. 2833 approval response from the Department of Energy (Ref: Docket No. 10-85-LNG) granting approval to export to Free Trade Agreement countries. 

August 11, 2010 - Department of Energy application of Sabine Pass Liquefaction, LLC. to request long-term authorization to export liquefied natural gas to Free Trade Agreement countries. (Ref: Docket No. 10-85-LNG)

 

Sabine Liquefaction Project Trains 5&6

Project Mapping

Site Plan and Creole Trail Pipeline Expansion - site plan of the Sabine Pass LNG Terminal with overlay of liquefaction expansion of the facility (Trains 5 - 6)  Download PDF >

Overview of Creole Trail Expansion Map - general location map for Sabine Pass Liquefaction and CTPL expansion projects. Download PDF >

 

FERC Documentation

September 1, 2016 - Notice to Proceed with Installation of Aboveground Piping and Equipment 

February 26, 2016 - Authorization to proceed with construction of underground piping

January 5, 2016 - Authorization to proceed with construction of piles for the areas Inside Battery Limits) of Train 5

July 9, 2015 - Authorization to proceed with site preparation and soil stabilization activities at the Sabine Pass Liquefaction Expansion Project

April 6, 2015 - Order Granting Authorization under Section 3 of the Natural Gas Act and Issuing Certificate for Sabine Pass Liquefaction Expansion Project

April 6, 2015 - FERC Authorization under CP13-552-000 granted

December 12, 2014 - Environmental Assessment Issued